NEW WHITELAND PLANNING & ZONING

FEE SCHEDULE

(Page 1 of 3 Pages)

 

Application Fee

 

Admin. Fee (Gen=l. Fund)                                                  $        5.00

 

RESIDENTIAL PERMITS and INSPECTIONS:

 

Single Family Dwelling including

Manufactured or Mobile Homes

 

Structure Built on Slab

Re-inspections

 

Admin. Fee (Gen=l. Fund)                                                  $    150.00

+ .05/sq.ft.

Inspection Fee (Insp. Fund)                                               $    225.00

                 ($75 + $75 + $75)

Under slab Plumbing Inspection (Insp. Fund)                $      50.00

$      35.00

 

Two Family & Multifamily Dwelling

(*Rough In and Final Inspections are required for each tenant/space)

 

Structure Built on Slab

Re-inspections

 

 

Admin. Fee (Gen=l. Fund)                                                  $    200.00

+ .05/sq.ft.

Inspection Fee (Insp. Fund)                                               $    300.00

                                ($100 + $100 + $100)

Under slab Plumbing Inspection (Insp. Fund)                $      50.00

$      50.00

 

Additions to existing Single Family Dwellings, including Manufactured or Mobile Homes, Two Family and Mulifamily Dwellings

 

 

Admin. Fee (Gen=l. Fund)                                                  $      50.00

 

Inspection Fee (Insp. Fund)                                               $    225.00

                                    ($75 + $75 + $75)

Under slab Plumbing Inspection (Insp. Fund)                $      50.00

Reinspection Fee                                                                 $      35.00

 

 

Storage Shed (max. 140 sq.ft.)

[see ' 3-400]

 

Admin. Fee (Gen=l. Fund)                                                  $        5.00

Inspection Fee (Insp. Fund)                                               $      35.00

 

Alterations, Modifications, and Remodeling,(Includes ALL structural changes except additions)

 

Admin. Fee (Gen=l. Fund)                                                  $      25.00

Inspection Fee (Insp. Fund)                                               $      35.00 per inspection

 

Driveways

 

Admin. Fee (Gen=l. Fund)                                                  $      25.00

Inspection Fee (Insp. Fund)                                               $      35.00

 

Detached Garages & Carports, or

Detached Buildings

(over 140 sq. ft.) [see ' 3-400]

 

Structure Built on Slab

 

Admin. Fee (Gen=l. Fund)                                                  $      25.00

Inspection Fee (Insp. Fund)                                               $    150.00

($75 + $75)

 

Under slab Plumbing Inspection (Insp. Fund)                $     50.00

 

Re-roof (only if replacing truss or rafters)

 

Admin. Fee (Gen=l. Fund)                                                  $     20.00

 

Swimming Pools:

Over 36" above ground

 

In ground

 

 

Admin. Fee (Gen=l. Fund)                                                  $     25.00

Inspection Fee (Insp. Fund)                                               $     35.00

Admin. Fee (Gen=l. Fund)                                                  $     50.00

Inspection Fee (Insp. Fund)                                               $   150.00

($75 + $75)

 

Demolition (all buildings and structures)

 

Admin. Fee (Gen=l. Fund)                                                  $     10.00

 

Sidewalk Cut

Required Bond for Cut

 

Admin. Fee (Gen=l. Fund)                                                  $     50.00

$1,000.00

 

Electrical

 

Admin. Fee (Gen=l. Fund)                                                  $     15.00

Inspection Fee (Insp. Fund)                                               $     35.00

 

Temporary Sign

 

Admin. Fee (Gen=l. Fund)                                                  $     10.00

 

Fine for beginning construction before

obtaining a building permit

 

Admin. Fee (Gen=l. Fund)                                                  $   100.00

 

COMMERCIAL PERMITS and INSPECTIONS:

 

New Buildings - Single Tenant, including any additions thereto (*Rough In and Final Inspections are required for each tenant/space)

 

Structure Built on Slab

 

Admin. Fee (Gen=l. Fund)                                                  $   200.00

+.05/sq.ft.

Inspection Fee (Insp. Fund)                                               $   300.00

($100 + $100 + $100)

 

Under slab Plumbing Inspection (Insp. Fund)                $     50.00

 

Land Alteration

 

Admin. Fee (Gen=l. Fund)                                                  $   300.00

Inspection Fee (Insp. Fund)                                               $   100.00

 

Billboard Signs

 

 

Annual fee for Billboard

 

Admin. Fee (Gen=l. Fund)                                                  $   300.00

+ .10/sq.ft.

Inspection Fee (Insp. Fund)                                               $     50.00

$   300.00

 

Alterations, Modifications, Remodeling

(includes ALL structural changes)

 

Admin. Fee (Gen=l. Fund)                                                  $   100.00

 

Inspection Fee (Insp. Fund)                                               $    100.00

 

Re-inspections

 

Inspection Fee (Insp. Fund)                                               $     50.00/item

 

Accessory Structures and Structures other than buildings, i.e. canopies, permanent signs, including subdivision entrance signs

 

Admin. Fee (Gen=l. Fund)                                                  $    100.00

Inspection Fee (Insp. Fund)                                               $    100.00

If footer used add another Inspection

                Fee (Insp. Fund)                                                   $    100.00

 

Demolition (all buildings and structures)

 

Admin. Fee (Gen=l. Fund)                                                  $     50.00

Construction Trailers

Admin. Fee (Gen=l. Fund)                                                  $     50.00

Inspection Fee (Insp. Fund)                                               $     25.00

Electrical Permit

Admin. Fee (Gen=l. Fund)                                                  $     35.00

Inspection Fee (Insp. Fund)                                               $     25.00

 

Sidewalk Cut

Required Bond for Cut

 

Admin. Fee (Gen=l. Fund)                                                  $     50.00

$1,000.00

 

Street Cut

Required Bond for Cut

 

Admin. Fee (Gen=l. Fund)                                                  $     50.00

$1,000.00

 

Temporary Sign (60 day duration)

 

Admin. Fee (Gen=l. Fund)                                                  $     25.00

Inspection Fee (Insp. Fund)                                               $     25.00

 

Fine for beginning construction before obtaining a building permit

 

Admin. Fee (Gen=l. Fund)                                                  $   500.00

 

PETITIONS:

 

Petition for Annexation

 

$300.00 + $5.00 per acre

 

Petition for Variance of Use

 

$  100.00

 

Petition for Variance of Dimensional Use

 

$    25.00

 

Petition for Special Exception

 

$  100.00

 

Petition for Rezoning

 

$  250.00

 

Sketch Plan for Minor Subdivision

 

$  100.00

 

Sketch Plan for Major Subdivision

 

$  250.00

 

PUD Filing Fees

 

 

Concept Plan                                                                        $  500.00

Preliminary Plat Approval & Rezoning                             $  500.00

Plus $5.00 per lot

Master Plan                                                                           $  250.00

Plus $5.00 per lot

Final Plat                                                                                $  250.00

Plus $5.00 per lot

 

Preliminary Plat for Minor Subdivision

 

$  200.00

 

Preliminary Plat for Major Subdivision

 

$  250.00

Plus $5.00 per lot

 

Secondary Plat for Major Subdivision

 

$  250.00

Plus $5.00 per lot

 

Generally Applicable Policies:

1.                  Each Administration Fee and Application Fee shall be collected at the time an application for a permit is submitted.  (Effective July 29, 2004.)

            (Adopted by the Plan Commission on July 27, 2004.)

 

[Editor=s Notes:

Revised 10/28/2003

Revised 7/27/2004

Revised 11/10/2004

Revised 11/24/2004

Revised 02/02/2005]

 

T:\N\NEWWHITE.LND\PLANCOMM\Planning&Zoning.FeeSchedule-Proposed11-24-04.doc